G/ Guides

Pre-bid diligence guides

Practical, document-led guides for the people on the hook for a bid. Each one walks through a report you will find in a deal's data room - what it is for, the lines that move a bid, and the red flags worth catching before you commit. Written for industrial and logistics acquisitions.

Reading the documents in the data room

Planning

How to read a planning permission and its conditions

The decision notice, the conditions that carry cost, whether the consent has lapsed, prior approval routes and appeals: what a planning file really commits a site to.

Read the guide →
Title & legal

How to read a title register

Extent and tenure, restrictive covenants that bind you as a successor, easements across the developable area, and the rights that never reach the register.

Read the guide →
Flood risk

How to read a flood risk assessment (FRA)

Flood zones, climate-change allowances and the mitigations that decide whether a site is developable - and at what cost.

Read the guide →
Environmental

Phase 1 vs Phase 2: reading contamination reports

Desk study or intrusive investigation: what each tells you about ground contamination, and the risk left unquantified before you bid.

Read the guide →
Ecology

How to read a Phase 1 ecological appraisal (PEA)

Protected species, designations and seasonal survey windows - the ecology findings that quietly add months to a programme.

Read the guide →
Biodiversity net gain

Biodiversity net gain (BNG): reading the metric

How the statutory metric works, on-site versus off-site units, and what mandatory 10% net gain really costs a scheme.

Read the guide →
Geotechnical

How to read a ground investigation report

Bearing capacity, settlement risk and made ground: the geotechnical findings that turn into cost and programme risk if you miss them before a bid.

Read the guide →
Measured survey

How to read a measured building survey

Floor plates, eaves heights and gross internal area: how to use the survey data in a data room to verify the commercial assumptions behind a bid.

Read the guide →
Transport & highways

How to read a transport assessment

Trip generation, access and servicing, section 278 highways works and travel plans: the transport commitments that decide what you can actually build.

Read the guide →

AI & pre-bid diligence

More guides are in progress - utilities and drainage. Tell us which document is slowing your bids down and we will prioritise it.